Language:
Project Newly built Hotel with parking basement van de Valk - Amsterdam (NL)
« Back to the project overview

Project

Newly built Hotel with parking basement van de Valk - Amsterdam (NL)

Start
10-05-2016
Finished
13-05-2016
Address
Joan Muyskensweg Amsterdam
Main contractor
Pleijsier Bouw
Constructor
n.v.t.
Engineering firm
Van Dijk Geo- en Milieutechniek
Contour
0 meter
Depth
9 meter
Ground profile
Project information

The CSM technique is generally used to achieve CSM-walls. The result can be used both as a construction wall to retain grond or water or as a soil improver . However, the CSM-system can also be deployed to broke underground obstacles which sit in a proper depth in the ground, by milling. So BodemBouw was asked by Pleijsier to broke a barrier at about 9 m. Depth. After BodemBouw had broken this obstacle, the proposed sheet piles could be reinstalled. The above highlights the low implementation risk of the CSM-system relative to other systems. Underground obstacles are much less a problem for the CSM-system and the system will be much easier get to desired depth.

The project progress

Foto's van 2016-05-10

Foto's van 2016-05-12

Building starts in the underground Make an appointment

This is what we offer

To relieve, by reducing execution risk and disruption to a minimum with the revolutionary, sustainable CSM-system. Achieving profit in time and cost by performing a complete cofferdam with an optimum method.

News

15-02-2016: BodemBouw starts with cooperating with contractor Mobilis in Elst
Read more »

08-01-2016: BodemBouw has completed the CSM-work for a closed cofferdam with CSM-walls, in Alverna
Read more »

Contact

Contact us for further information and advice.

BodemBouw B.V.
Veghelsedijk 2E
5406 TE Uden
T: +31 (0)85 - 877 2002
E: contact@bodembouw.nl