Relatively close to the planned apartment tower with basement of the new "East End" in Hilversum, lays a high pressure water and a sewage system. Initially it was planned to realize the construction pit in an open excavation, however, additional research shows that waterworks come to lie in the slope. A ground retaining wall is necessary on the side of the pipe and sewer system to perform the required excavation safely and responsibly. The ground retaining wall is to be provided by a vibration-free method, since vibrations can lead to unacceptable settlements. In addition, the ground retaining wall is to be considered as lost , since the removal of the ground retaining wall gives hollow space, which can lead to unacceptable settlements.
Because of the relatively hard and sandy foundation of Hilversum , the CSM system is ideal in this situation.
To relieve, by reducing execution risk and disruption to a minimum with the revolutionary, sustainable CSM-system. Achieving profit in time and cost by performing a complete cofferdam with an optimum method.
15-02-2016:
BodemBouw starts with cooperating with contractor Mobilis in Elst
Read more »
08-01-2016:
BodemBouw has completed the CSM-work for a closed cofferdam with CSM-walls, in Alverna
Read more »
Contact us for further information and advice.
BodemBouw B.V.
Veghelsedijk 2E
5406 TE Uden
T: +31 (0)85 - 877 2002
E: contact@bodembouw.nl
www.bodembouw.com