Language:
Project Construction of a new home with basement, Parklaan - Veghel (NL)
« Back to the project overview

Project

Construction of a new home with basement, Parklaan - Veghel (NL)

Start
07-03-2016
Finished
18-03-2016
Address
Parklaan 1 - Veghel
Main contractor
Bouwbedrijf van de Ven
Constructor
Frits Verzantvoort - VCR B.V.
Engineering firm
Guus van den Brink - Inpijn-Blokpoel
Contour
70 meter
Depth
10 meter
Ground profile
Project information

For the realization of a new home including basement on the Parklaan x Haute in Veghel, excavation is required. On the right side lies the new building close to existing buildings. At the front of the new home with basement lies the street on short distance, here are utility lines located. For a safe excavation of the cofferdam retaining walls are needed. The retaining walls must be applied with a vibration-free method.

The present ground is suitable for applying the Cutter Soil Mix - system. With the Cutter Soil Mix - system a Cutter Soilmix – wall is made vibration-free by mixing the present ground with cementmix. The mixed result is reinforced with steel reinforcement bars.

The benefits of Cutter Soilmix - system are the low implementation risk, minimal disruption to surroundings and a practical result. For example, at the time that the cofferdam is used, the CSM-wall has a temporary earth-retaining and water inhibiting function. However, the CSM-wall can be used as a foundation, it than has a permanent feature.

Therefore in Veghel we opted for a completely closed cofferdam performed with CSM walls. This works good for the emergent water hazard, but even better, savings could be found into excavations and foundation piles by using the CSM-wall as a foundation.

The project progress

Foto's van 2016-03-04

Foto's van 2016-03-07

Foto's van 2016-03-11

Foto's van 2016-03-24

Foto's van 2016-04-28

Foto's van 2016-05-12

Building starts in the underground Make an appointment

This is what we offer

To relieve, by reducing execution risk and disruption to a minimum with the revolutionary, sustainable CSM-system. Achieving profit in time and cost by performing a complete cofferdam with an optimum method.

News

15-02-2016: BodemBouw starts with cooperating with contractor Mobilis in Elst
Read more »

08-01-2016: BodemBouw has completed the CSM-work for a closed cofferdam with CSM-walls, in Alverna
Read more »

Contact

Contact us for further information and advice.

BodemBouw B.V.
Veghelsedijk 2E
5406 TE Uden
T: +31 (0)85 - 877 2002
E: contact@bodembouw.nl