Language:
Project Railwayzone with underpasses - Elst (NL)
« Back to the project overview

Project

Railwayzone with underpasses - Elst (NL)

Start
25-01-2016
Finished
05-02-2016
Address
Oude Aamsestraat 20, Elst
Main contractor
Mobilis TBI
Constructor
Movares
Engineering firm
Movares
Contour
60 meter
Depth
14 meter
Ground profile
Project information

The railway zone at the station in Elst is rebuilted with two new underpasses by contractor Mobilis and engineer Movares. One underpass for fast traffic and one underpass for slow traffic. To realize the access road to the underpass at the Old Aamsestraat only sheet piles were originally designed. Sheetpile contracter "Voorbij" has the sheet piling work in progress and is ready with installing the sheetpiles by vibrating. BodemBouw will complete the rest of the excavation of the ramp near by the existing buildings with a CSM-wall, which is made without any vibrations. The CSM wall will be soil- and watertight connected on the existing sheet piles, whereby the closed cofferdam is obtained. The point level of the CSM-walls will extend to to a natural retaining caly layer to create a polder cofferdam.

The project progress

Foto's van 2016-01-21

Foto's van 2016-01-28

Foto's van 2016-02-01

Foto's van 2016-02-03

Foto's van 2016-04-11

Building starts in the underground Make an appointment

This is what we offer

To relieve, by reducing execution risk and disruption to a minimum with the revolutionary, sustainable CSM-system. Achieving profit in time and cost by performing a complete cofferdam with an optimum method.

News

15-02-2016: BodemBouw starts with cooperating with contractor Mobilis in Elst
Read more »

08-01-2016: BodemBouw has completed the CSM-work for a closed cofferdam with CSM-walls, in Alverna
Read more »

Contact

Contact us for further information and advice.