BodemBouw has completed the work for a closed cofferdam with CSM-walls in Alverna. The following up work involves the drilling of anchor piles. When the poles are arranged, BodemBouw will continue with applying tubes over the entire surface of the cofferdam. The tubes are for injection a horizontal layer of Natrium Silicate to stop groundwater from floating in from the bottom of the closed cofferdam.
« Back to overview
To relieve, by reducing execution risk and disruption to a minimum with the revolutionary, sustainable CSM-system. Achieving profit in time and cost by performing a complete cofferdam with an optimum method.